Tokyo Bay
The build
Built in Hamburg by Howaldtswerke-Deutsche Werft, Tokyo Bay’s design drew from the teething problems experienced by OCL’s Encounter Bay class on the Australian run, with changes to the bow and hull shape intended to reduce pitching and torsional movements in heavy seas.
Of 289.57m (950ft) loa, Tokyo Bay was originally powered by two Foster Wheeler ESD III roof-fi red boilers supplying super-heated steam to twin Stal-Laval cross-compound turbines, each developing 40,560shp at 136rpm. The twin-screw vessel had a service speed of 26 knots – although it reached 30.06 knots during trials – and was fitted with two transverse bow thruster units and a set of activated fin stabilisers of 80 tons lift each side. The bridge layout was finalised after a full-size mock-up was built to optimise the location of the equipment to reflect different navigational demands during coastal and general at-sea operations.
"The twin-screw vessel had a service speed of 26 knots – although it reached 30.06 knots during trials..."
When launched, Tokyo Bay’s eight holds were designed to accommodate 1,944 containers stowed in cells 10 wide across the ship and nine high. The remaining 356 were stowed on the hatch covers, stacked three high and 13 wide across the vessel. The ship initially had a crew of 38, and the master, chief officer, senior second officer and junior second officer all held master’s certificates. There were also three first-class certificate holders in the engine department. In 1981 Tokyo Bay was fitted with new engines – two eight-cylinder Sulzer diesels – at the Mitsubishi Heavy Industries yard in Kobe.
Deployments
The OCL vessel Tokyo Bay was the first of a new generation of £10m British containerships for the Far East run and was initially deployed in the Trio Lines consortium, formed by two British companies, two Japanese operators and a West German firm.
Claimed by OCL to be the largest and most powerful containership built when launched in 1972, the vessel was of 59,068 gross tons with a capacity for some 2,300 20ft containers. It was said to be capable of doing the same work as up to eight conventional cargoships.
While sailing to the breakers in Alang, India, as the Jay Matadi and under the St Vincent & Grenadines flag, the vessel suffered an engineroom fire in the South China Sea. The crew had to be evacuated onto the P&O Nedlloyd Barcelona and the ship had to be ignominiously towed to Singapore before demolition in October 1998.
"[Tokyo Bay] was said to be capable of doing the same work as up to eight conventional cargoships..."
Ownership
In November 1984, the vessel was sold to the Chase Manhattan bank and leased to OCL.
In June 1986 P&O acquired OCL, turning the resulting fleet into P&O Containers Ltd (P&OCL). Between 1991 and 1995, Tokyo Bay’s ownership shifted between P&OCL and Howill Shipping, and in April 1996 the vessel was flagged out to Bermuda just a few months before being chartered to Neptune Orient Line and renamed NOL Steno.
The ship served on NOL’s services between the US east coast and the Far East for almost two years, before returning to P&O Nedlloyd in February 1998. Renamed P&O Nedlloyd Tokyo, the vessel was sold for scrap only six months later.
Fact File
Where was the Tokyo Bay built?
The Tokyo Bay was built in Hamburg by Howaldtswerke-Deutsche Werft
How big was the Tokyo Bay?
At 289.57 metres long, with eight holds designed to accommodate 1944 containers
How many crew were needed to man the Tokyo Bay?
38
What was the Tokyo Bay's purpose?
Claimed by OCL to be the largest and most powerful containership built when launched in 1972, the vessel was of 59,068 gross tons with a capacity for some 2,300 20ft containers
Who was a famous owner of Tokyo Bay?
In November 1984, the vessel was sold to the Chase Manhattan bank
Memories
Punctured pride: Dr Chris Haughton recalls the surprise of being overtaken by the Toyko Bay whilst serving on Queen Elizabeth 2. Read more...
Speed debates: Ian Aitken was surprised to see the Tokyo Bay's top speed quoted lower than the top trial speed he was told as a second engineer onboard in 1975. Read more...
Connecting letters: John Barton is pleased to have an excuse to reminisce his time building, sailing and servicing all five ships in the Bay class. Read more...
From bad to worse: When Michael Bond read about the Toyko Bay, it reminded him of some challenging times he had onboard the similar vessel Remuera Bay. Read more...
Work hard, play hard: A collection of stories from our social media channels describing the Bay class of ships as the 'party ships' with great crew and happy memories. Read more...
The haunted hold: Gareth Mathias tells the story of 'Herman the German' who supposedly haunted Tokyo Bay. Read more...
Contribute
Are you knowledgeable about this vessel?
Submit your contribution to this article to our editorial team.
Write to usView more ships of the past
HMS Beagle
Launched 200 years ago, HMS Beagle has been described as one of the most important ships in history – thanks to the observations on evolution and natural selection that its famous passenger Charles Darwin made during a five-year voyage around the world between 1831 and 1836.
Common.ReadMoreHMS Beagle
City of Winchester
Entering into service 70 years ago, the Ellerman Lines general cargo ship City of Winchester exemplifies much of the history of the British Merchant Navy during the second half of the 20th century.
Common.ReadMoreCity of Winchester
Nicola
Launched in December 1967 at the Austin & Pickersgill (A&P) yard in Sunderland, the 9,034grt general cargoship Nicola was the first in a series of more than 200 British-designed vessels intended to replace the 'cheap and cheerful' Liberty ships built by the US during the Second World War.
Common.ReadMore